Electrical emergency?
Call 609-238-4689 now, day or night.

Treadmills, racks and lights, all on circuits that were never planned for a gym. Chris gives them the power they need, priced first.
Dedicated circuits for equipment, bright even LED lighting, and repairs for gyms and fitness studios across South Jersey. Licensed and insured, free estimate, price agreed before work starts.
- Licensed
- NJ #19320
- Insured
- Proof available on request
- 5.0 from 28 reviews
- Emergencies
- 24/7, he picks up
Get a commercial estimate
Tell him about the property. He answers his own phone.
- 5.0 rating on Google
- 28 five-star reviews
- NJ licensed #19320
- Insured
- Free estimates
- 24/7 emergency service
- Residential and commercial
- Based in West Berlin, NJ

What he does
Power for the equipment floor, and lights that stay on.
Dedicated circuits for equipment
Treadmills and powered machines on their own circuits, the way their makers ask for.
Bright, even LED lighting
A floor lit from wall to wall, with less heat and a lower bill.
Outlets where the layout goes
Power for new machines, screens and the front desk, where they actually sit.
Fit-outs and build-outs
Rough-in and finish work when a space becomes a gym or a studio grows.
Panels and service upgrades
A panel sized for a full equipment floor, labelled so staff can find the right breaker.
Emergency repairs
The circuit that drops at peak hours, answered 24/7.
His work
His commercial work, photographed on the job.
LED lighting across a steel building, two new panels set side by side, and an apartment panel opened up for a breaker swap.

LED lighting across a steel building
South Jersey

Two new panels, set side by side
South Jersey

An apartment panel opened up for the breaker swap
Lindenwold, NJ
Good to know
What New Jersey asks of gyms and fitness studios, and what it means for the job.
- Permits for new circuits
- New circuits or a subpanel for an equipment floor or a build-out are permitted work under N.J.A.C. 5:23-2.14, inspected before they are used. Source
- GFCI in locker rooms and showers
- NEC 210.8(B) requires GFCI protection on receptacles in locker rooms with showers and other wet or damp areas, a rule broadened in recent code cycles to specifically cover facilities like gyms. Source
- Emergency lighting duration
- Battery-backed emergency lighting and exit signs must hold illumination for 90 minutes on backup power, tested monthly for 30 seconds and annually for the full 90 minutes. Source
How a commercial job runs
He looks at the job first, and the price comes before the work.
01
He comes out and looks
The price comes from what is actually there, so the first step is a look at the panel, the space and what you want done. Anything that changes the scope, you hear about before the number.
02
One price, agreed first
The estimate is free, and the number is agreed before any work starts.
03
The permit goes in
New circuits, panels and wiring are permitted work in New Jersey, so the permit goes through the municipal construction office and the inspection closes it out.
04
Labelled and left clean
Every breaker he touches gets a clear description of what it feeds, so the next call starts with a panel anyone can read.
Before the work starts
Questions owners and managers ask.
Straight answers, read off the code and the state's own rules.
01Should my treadmills and powered machines be on their own circuits?
Commercial-grade treadmills and other heavy fitness equipment are specifically called out as the kind of load that should run on its own dedicated circuit. Sharing a circuit with other equipment can cause voltage drops that shorten motor life and lead to breakers tripping mid-workout. It also limits how many machines you can safely add to one wall or row without upgrading circuits.
02Do my locker rooms and showers need GFCI-protected outlets?
Yes. The National Electrical Code requires GFCI protection on receptacles in locker rooms with showers, bathrooms, and any other indoor wet or damp area in a non-residential building. This rule was broadened in recent code cycles specifically to cover facilities like gyms and athletic clubs. Any outlet near a sink, shower, or wet floor area in your facility falls under this rule.
03Do I need a permit to add circuits for new equipment or a buildout?
Yes, running new circuits or adding a subpanel for new equipment rows, a sauna, or a studio buildout requires a construction permit under New Jersey's Uniform Construction Code. The permit has to be filed by a licensed electrical contractor, and the work needs to pass inspection before it's used. A straight equipment swap on an existing dedicated circuit is a smaller lift than new circuit work.
04What's required for exit and emergency lighting on the gym floor?
Battery-backed emergency lighting and exit signs need to hold illumination for 90 minutes if power is lost, with a logged 30-second functional check monthly and a full 90-minute load test once a year. This applies across the facility, not just hallways, since members need a lit path out from the floor and locker rooms. Any unit that fails the annual test should be repaired or replaced right away.
Other commercial work
He works on every kind of commercial property, from one storefront to a whole complex.
Licensed and insured, NJ #19320. If your building is not on this list, call anyway.

Apartment complexes
Turnovers between tenants and the same fix run through every unit, priced as one job.

Retail, strip malls and storefronts
Storefront, canopy and parking lot lighting, and power where the layout changed.

Restaurants and bars
Dedicated circuits for the kitchen line and lighting for the dining room.

Offices and warehouses
LED high-bays across the ceiling, build-outs and power where the work happens.

Get the price first
Tell him about the property and he will tell you what it costs.
The estimate is free. It helps to have these ready:
- How many machines, and which ones are powered.
- What is tripping or what you are adding.
- A photo of the panel with the door open.
- Your open hours, so the work fits around members.
- Who can let him in.
Get a commercial estimate
Free, and the price is agreed before work starts.